This is a standard sight around here: Diego working in the garage on the crib. He's been in there much of the afternoon today working on the finish coat. In the top photo, you can see the piano hinge and locking hardware have been installed so that the side can fold down (allowing easier access to baby). At this point, he has the drawers to install, the mattress framing to install and to finish the shilac coat. Diego has done an amazing job on the crib! It won't be long before we'll be posting complete crib pictures or pictures with the baby IN the crib.
Sunday, September 24, 2006
Diego Hard at Work
Posted by Mary at 7:15 PM
Subscribe to:
Post Comments (Atom)
1 comment:
looking incredible. The design is beautiful.
Post a Comment